We will be installing a new boardwalk (the 2nd on this trail) on the Keith Dr Road Right of Way (ROW)
Date: Sep 22
Time: 1:30 – 3:00
Meet: At the end of Keith Dr
Tools: A shovel and/or a pick. An impact driver or drill with #2 sq bit. Wheelbarrows to transport materials will be useful too.


